Brick Paver Installation & Edging



Staging of material

Most paver jobs will vary depending on gain access to, site conditions, task size and obviously, the weather condition. These circumstances can have an overall effect on your task from a timing stand point. Cautious consideration must be taken to identify the time to start the paver installation. Constantly aim to avoid any traffic or decrease on the prepared locations.

The supervisor or project supervisor should constantly have the products (sand/ pavers) dispersed around the project website for effective and easy installations. Paver pallets/bundles need to be placed in a way not to hinder the paver installation. The appropriate pallet/bundle placement can make the real project installation simpler and quicker by lowering the overall labor of dealing with the material.

Brick paver patterns

Pavers can be put in several patterns depending on their shape. Each paver shape will usually have several various hatch patterns that are supplied by the manufacturer.

The laying pattern and shape of the paver is really critical to the performance of the application. Specialists need to think about the traffic weight loads on their paver projects. 90 or 45 degree herringbone patterns are suggested in all street and driveway applications, as these patterns will supply the optimum load support required and will withstand creeping from the turning of tires and braking or beginning of automobile traffic. In most applications worldwide, it has actually been shown that pavers laid in a herringbone pattern have carried out effectively.

Pavers that are 60 mm (2 - 3/8 in) thickness are suitable for pedestrian applications. Pavers that are going to be utilized in commercial or industrial applications must be 80 mm (3 - 1/8 in) in density.

Reference/starting point for brick paver installation

There are a variety of conditions that determine the starting point of a paver job.

When beginning to set up pavers it is best to snap a real straight chalk line on the surface of the bedding sand or pull a true straight string line above the surface area of the bedding sand at the ended up elevation of the pavers This will assist as a guide for maintaining straight joint lines and will also enable the installer to make changes in the positioning of the pavers.

Buildings and concrete curbing are typically not straight and must not be utilized for developing straight joint lines. The use of string lines is necessary to identify the true straightness of the edge too. As the paver installation progresses, the string lines will help reduce the need for little trim pieces.

These will preserve a minimum joint width and permit the bed linen and jointing sand to get in in between each paver. Pavers with spacer bars are generally not laid in snug against each other because a string line will offer consistent joint spacing.

Installation of brick pavers.

One of the most widely used methods for the installation of pavers is hand installation of each paver. It is best to install a single row of pavers along one of the true straight lines that you have actually pulled or above the bed linen sand. The finest approach is to position a paver versus another one and let it move down into the bed linen sand.

When setting up pavers on a high grade, they must be set up at the base of the grade going uphill. This will avoid the pavers from creeping as they are being laid.

The finest way for installing pavers on large projects is to install them mechanically. There are a couple items a contractor should consider prior to setting up pavers mechanically:

1.) Mechanical installers are just efficient in setting up pavers in specific patterns.

2.) The professional must make sure that the maker can production and bundling pavers in the preferred pattern on the pallets for easy mechanical installation.

3.) Contractors may come across a color mixing circumstance coming off the bundles of pavers Poor color blending could lead to an irregular looking installation. Many manufacturers are consistent with color mixing on each package of pavers, but it is the contractor's responsibility to make sure appropriate mixing in the field.

Cutting procedures for brick pavers.

Specialists usually have two ways of cutting pavers. Pavers are cut either by 1). A double bladed guillotine or by 2). A gas powered cut off saw or brick saw which is geared up with a diamond blade. The diamond blade cut-off saw or brick saw will offer a much cleaner and more accurate cut. The majority of brick saws will have a tube accessory on them which will allow the operator to cut the pavers damp. When cutting pavers wet, it will assist reduce dust and will prolong the diamond blades life. The operator of the brick saw need to constantly cut the pavers away from the surface of the paver field when cutting wet, due to the fact that the pavers will produce a slurry that will stain the paver surface. Pavers that are cut need to not fit tight, enough spacing ought to be available for jointing sand.

The brick saw operator must always use the appropriate protection that is required for operating a saw, such as eye, ear, breathing and hand security ).

Edging types

Edge restraints play a major function in the overall success of an interlocking pavement installation Edging restraints remove lateral motion of the pavers and hold the pavers tightly together. Specifically at the outer boundary of the paver application, without an edging restraint, your job is guaranteed to stop working gradually.

Usually manufactured edge restraints are the most typically used by professionals. Manufactured edging restraints can range from, plastic edging, steel and aluminum, lumbers or precast concrete and stone.

Edging installation.

This might result in the migration of the bedding sand and eventual lateral motion of the pavers. If there is a possibility of losing bedding sand in between the pavers and the edge restraint, then geo textile fabric is advised. When a gap in between the pavers and the edging goes beyond 3/8" (10mm), then the space must be filled with cut pavers.

Compaction of brick pavers.

After installation, the pavers have to be compacted. The whole location that South Florida Pavers is to be compacted must be swept tidy of any foreign objects and debris that can trigger scratching or scuffing on the surface of the pavers.

In addition, it is crucial that the very first compaction takes place before any jointing sand has been used to the pavers. If jointing sand is used to the pavers before compaction takes place, this can cause a bridging issue and will not permit the joints to be completely filled with jointing sand. This can also prevent the pavers from being appropriately set into the bed linen sand.

When compacting the pavers, it is recommended that you make at least 2 passes in various instructions across the pavers. This will allow the pavers to be correctly embeded in the bed linen sand and will require the bedding sand up into the joints from the bottom of the pavers.

The compaction of the pavers is very crucial to the last efficiency of the pavers. Failure to do correct compaction can lead to deformations and pavement failure over time.


Paver pallets/bundles ought to be put in a way not to interfere with the paver installation. One of the most extensively utilized methods for the installation of pavers is hand installation of each paver. The operator of the brick saw ought to always cut the pavers away from the surface of the paver field when cutting damp, due to the reality that the pavers will develop a slurry that will stain the paver surface area. Edging restraints eliminate lateral movement of the pavers and hold the pavers firmly together. When a gap between the pavers and the edging surpasses 3/8" (10mm), then the space must be filled with cut pavers.

Leave a Reply

Your email address will not be published. Required fields are marked *